Image default
SC Politics

South Carolina Must Seize Its Nuclear Moment

“Other states can point to nuclear history. South Carolina can point to nuclear infrastructure.”

Getting your Trinity Audio player ready...
by TOM DAVIS *** This week, I filed a joint resolution in the South Carolina Senate – S.
You must Subscribe or log in to read the rest of this content.

Related posts

Crossroads 2026

Josh Kimbrell Bows Out of South Carolina Governor’s Race

Mark Powell
Crossroads 2026

Reporter Seeks To Unseal David Pascoe’s Family Court Files

Will Folks
Crossroads 2026

Letter: Ralph Norman is Offering Something Different

Letters

3 comments

Smell My Natural Gas February 20, 2026 at 10:09 am

Uh oh, someone’s suggesting breaking off our addiction to fossil fuels again! Get ’em, boys!

Reply
Bill February 20, 2026 at 12:03 pm

This looks good, as long as it’s not an end run for an AI build. That will steal the electricity SC badly needs for our future. Note: SC already had one of the very first Nuclear Research reactors. It was located near VC Summer Nuke Reactor in Jenkinsville. It was called: PARR Nuclear Station. Further, SC should restart and finish VC Summer #4. Yes, there were 3 earlier Nuke Power plants built and planned at the Jenkinsville sites. VC Summer #1 finished and on line; VC Summer #2 Foundations built, never built, foundations covered up. A total loss; VC Summer #3 Engineering Plans and Construction Designs near completion. VC Summer #3 canceled. What was left are VC Summer #4 & #5 both abandoned. That’s SC’s history of Nuke Power at VC Summer; 1 out of 5. Sad, but true.

Reply
Bill Halstead February 21, 2026 at 7:24 am

What protection do we have from the corruption involved last time around?

Reply

Leave a Comment